首页> 外国专利> Production of Electricity from Geothermal Energy System

Production of Electricity from Geothermal Energy System

机译:利用地热能系统发电

摘要

The present invention relates to a method for constructing a geothermal power generation system by using an artificial crack induction. The geothermal power generation system includes an injection hole (110) through which circulation water is injected, a discharge hole (120) through which the circulation water heated by geothermal heat is discharged; and a circulation water movement passage (200) connecting the circulation water. The circulation water movement passage (200) includes an artificial crack (210) which connects the injection hole (110) to the discharge hole (120). The method comprises: a first step (S100) of excavating the first injection hole (110) and the discharge hole (120); and a second step (S200) of forming an artificial crack (210) by hydraulic fracturing. The second step (S200) includes: a pre-treatment step (S210) of specifying a direction of forming the artificial crack (210); and an artificial crack (210) forming step (S220) of forming the artificial crack (210) by applying water pressure to the lower portion of the injection hole (110) or the discharge hole (120). According to the present invention, a direction to form an artificial crack by hydraulic fracturing is specified, and it is possible to construct a geothermal power generation system in accordance with this design.
机译:本发明涉及一种通过使用人工裂缝诱导构造地热发电系统的方法。地热发电系统包括:注入孔(110),通过该注入孔注入循环水;排放孔(120),通过地热水排放通过地热加热的循环水;排放孔(120)。循环水移动通道(200)连接循环水。循环水移动通道(200)包括将注入孔(110)连接至排放孔(120)的人造裂缝(210)。该方法包括:挖掘第一注入孔(110)和排放孔(120)的第一步骤(S100);通过水力压裂形成人造裂缝(210)的第二步骤(S200)。第二步骤(S200)包括:预处理步骤(S210),其指定人造裂缝(210)的形成方向;以及人造裂缝(210)形成步骤(S220),其通过向注入孔(110)或排出孔(120)的下部施加水压来形成人造裂缝(210)。根据本发明,确定了通过水力压裂形成人造裂缝的方向,并且可以根据该设计来构造地热发电系统。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号