首页> 外国专利> An efficiency calculation method of artificial recharge of groundwater using submerged galleries

An efficiency calculation method of artificial recharge of groundwater using submerged galleries

机译:利用淹没区人工补给地下水的效率计算方法

摘要

An efficiency calculating method based on an artificial recharge of groundwater using an underground penetration type gallery according to the present invention comprises: (a) a step of establishing an underground penetration type gallery in a hydrothermal area; and (b) a step of measuring a groundwater level under the ground while varying the amount and time of groundwater injection into the underground penetration type gallery installed in the step (a). Using the efficiency calculating method based on artificial groundwater analysis using the underground penetration type gallery according to the present invention, it is possible to evaluate quantitatively how much groundwater flowing out after using water cultivation can be re-injected into a free surface aquifer. Thus, it is possible to prevent the groundwater from declining at the time of activating water film cultivation.
机译:根据本发明的基于利用地下渗透型廊道人工补给地下水的效率计算方法,包括:(a)在热液区中建立地下渗透型廊道的步骤; (b)在改变在步骤(a)中安装的地下渗透型廊道中注入地下水的量和时间的同时,测量地下的地下水位的步骤。使用根据本发明的基于地下渗透型廊道的基于人工地下水分析的效率计算方法,可以定量地评估使用水栽培后流出的地下水可以多少注入到自由地表含水层中。因此,可以防止在激活水膜培养时地下水下降。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号