SLIME TREATMENT METHOD IN CAST-IN-PLACE PILE CONSTRUCTION METHOD

机译:现浇桩施工中的粘泥处理方法

摘要

PROBLEM TO BE SOLVED: To provide a slime treatment device in a cast-in-place pile construction method and a method thereof, capable of efficiently removing slime by coping with both of delivery time of requiring operability and winding time of requiring large hoisting force.;SOLUTION: A slime treatment device is basically provided in a cast-in-place pile construction method for controlling in two stages of low pressure L when delivering F a mud lifting hose 30 caused by a descent of an underwater sand pump 100 into the underground hole and high pressure H when winding W of the underwater sand pump 100 in the underground hole, due to separating an installation place of the slime treatment device 1 by a constant distance from the muddy water surface of the underground hole, since the depth of the excavating underground hole is deep, the underground hole is excavated underground, or the slime treatment device 1 is installed in a place having a constant distance from an opening part of the underground hole and the muddy water surface.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2019,JPO&INPIT
机译:解决的问题:提供一种在现浇桩施工方法中的泥浆处理装置及其方法,该泥浆处理装置能够通过应对需要可操作性的输送时间和需要大的提升力的卷绕时间两者来有效地去除泥浆。解决方案:基本上,在现场灌注桩施工方法中提供了一种泥浆处理设备,用于在将F输送由地下砂泵100下降导致的泥浆提升软管30时,在两个阶段的低压L中进行控制。当将水下砂泵100缠绕在地下孔中时,由于泥浆处理装置1的安装位置与地下孔的泥水表面隔开恒定的距离,因此,当孔W和高压H高时,开挖地下孔较深,或在地下开挖地下,或者将泥泥处理装置1安装在距开孔部分一定距离的地方。地下洞和泥泞的水面。;选定的图纸:图1;版权:(C)2019,JPO&INPIT

著录项

  • 公开/公告号JP2019094677A

    专利类型

  • 公开/公告日2019-06-20

    原文格式PDF

  • 申请/专利权人 DAIYO KIKO KOGYO KK;

    申请/专利号JP20170224791

  • 发明设计人 NISHIUCHI IKUO;

    申请日2017-11-22

  • 分类号E02D5/34;E02D15/06;

  • 国家 JP

  • 入库时间 2022-08-21 12:25:12