首页>
外国专利>
UNIAXIAL COMBINED CYCLE PLANT, UNIAXIAL COMBINED CYCLE PLANT TESTING METHOD AND UNIAXIAL COMBINED CYCLE PLANT CONTROL DEVICE
UNIAXIAL COMBINED CYCLE PLANT, UNIAXIAL COMBINED CYCLE PLANT TESTING METHOD AND UNIAXIAL COMBINED CYCLE PLANT CONTROL DEVICE
展开▼
机译:单轴联合循环厂,单轴联合循环厂测试方法及单轴联合循环厂控制装置
展开▼
页面导航
摘要
著录项
相似文献
摘要
To perform an overspeed prevention test for a steam turbine at a uniaxial combined cycle plant without engagement of a clutch for connecting a steam turbine to a gas turbine through synchronization in engine speed.SOLUTION: A uniaxial combined cycle plant comprises a power generator, a gas turbine, a steam turbine driven through application of waste-heat of the gas turbine and connected to the power generator through a clutch when an engine speed is synchronous with an engine speed of the gas turbine, a steam turbine overspeed prevention device, a gas turbine overspeed prevention device and a control device. The control device causes the power generator to be in an unloaded condition, increases an engine speed Ns of the steam turbine until it reaches a steam turbine upper limit engine speed Nslim while keeping an engine speed Ng of the gas turbine higher than an engine speed Ns of the steam turbine and lower than a gas turbine upper limit engine speed Nglim (times t2 to t4) to test whether or not the steam turbine overspeed prevention device is operated normally.SELECTED DRAWING: Figure 2
展开▼