首页> 外国专利> INSTALLATION METHOD OF STEEL PIPE PILE, AND STEEL PIPE PILE AND INSTALLATION DEVICE USED IN INSTALLATION METHOD

INSTALLATION METHOD OF STEEL PIPE PILE, AND STEEL PIPE PILE AND INSTALLATION DEVICE USED IN INSTALLATION METHOD

机译:钢管桩的安装方法以及采用该方法的钢管桩及安装装置

摘要

To provide an installation method of a steel pipe pile capable of burying a steel pipe pile without using a large-sized heavy machine, and a steel pipe pile and an installation device used in the installation method.SOLUTION: An installation method of a steel pipe pile 10 includes a step of arranging a weight 21 for installation having a first weight 21A inside a first steel pipe pile 11 with a bottomed tip part 11A and repeating dropping of the weight 21 toward the bottomed tip part 11A so as to install the first steel pipe pile 11 into the foundation G. When the length of the steel pipe pile 10 to be installed in the foundation G is longer than that of the first steel pipe pile 11, the installation method includes a step of fixing the tip part of a second steel pipe pile 12 opening on both ends to a rear end part of the first steel pipe pile 11 so as to enlarge the entire length of the steel pipe pile 10 to be installed, and thus a necessary installation length can be obtained.SELECTED DRAWING: Figure 3
机译:本发明提供一种无需使用大型重型机械即可埋入钢管桩的钢管桩的安装方法,以及用于该钢管桩的安装方法。桩10包括以下步骤:将具有第一配重21A的用于安装的配重21布置在具有底部末端部分11A的第一钢管桩11中,并重复将配重21向底部末端部分11A下落,以安装第一钢当将要安装在基础G中的钢管桩10的长度比第一钢管桩11的长度长时,安装方法包括固定第二钢管桩11的尖端部分的步骤。钢管桩12的两端向第一钢管桩11的后端部敞开,从而增大了要安装的钢管桩10的全长,因此可以获得必要的安装长度。 ED绘图:图3

著录项

  • 公开/公告号JP2018197453A

    专利类型

  • 公开/公告日2018-12-13

    原文格式PDF

  • 申请/专利权人 MARUKO JURYO:KK;

    申请/专利号JP20170102578

  • 发明设计人 TAKAHASHI SETSUO;

    申请日2017-05-24

  • 分类号E02D7/08;E02D13/00;E02D5/28;E02D5/72;E02D5/48;

  • 国家 JP

  • 入库时间 2022-08-21 12:23:02

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号