首页> 外国专利> METHOD FOR INJECTION OF SETTING MATERIAL APPLIED TO POST-INJECTION TYPE ROCK BOLT

METHOD FOR INJECTION OF SETTING MATERIAL APPLIED TO POST-INJECTION TYPE ROCK BOLT

机译:注入后型岩石锚杆上注料的注入方法

摘要

PROBLEM TO BE SOLVED: To provide a method for injection of a setting material applied to a post-injection type rock bolt by which a leakage of setting materials is prevented easily by means of a simple pressing-on system of an exclusive temporary plate.;SOLUTION: A method for injection of setting materials applied to a post-injection type rock bolt according to the present invention for inserting a rock bolt into a rock bolt insertion hole, and then injecting and setting the setting materials, has the steps of: attaching a temporary plate to a head section of the rock bolt put side by side with an injection pipe and an exhaust pipe so that the injection pipe, the exhaust pipe, and the head section of the rock bolt can pass through the temporary plate; inserting the rock bolt into the rock bolt insertion hole until the temporary plate abuts against a sprayed concrete surface; fixing angle members that press the temporary plate through spacer materials or directly, to the sprayed concrete; and also injecting the setting materials from the injection pipe until the setting materials flow out from the exhaust pipe.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2019,JPO&INPIT
机译:本发明要解决的问题是:提供一种注入到后注入式岩石锚杆上的凝固材料的方法,通过这种方法,可以通过专用临时板的简单压紧系统容易地防止凝固材料的泄漏。解决方案:一种根据本发明的应用于后注入式岩石锚杆的凝固材料的注入方法,该方法用于将岩石锚杆插入到岩石锚杆插入孔中,然后注入并凝固定位材料,该方法具有以下步骤:临时板到与注入管和排气管并排放置的锚杆的头部,以便注入管,排气管和锚杆的头部可以穿过临时板。将岩石螺栓插入岩石螺栓插入孔,直到临时板抵靠喷涂的混凝土表面为止;固定角钢构件,将角撑板通过垫片材料或直接压在喷涂混凝土上; ;选择的图纸:图1;版权:(C)2019,JPO&INPIT;从注料管注入定型材料,直到定型材料从排气管流出为止。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号