PROBLEM TO BE SOLVED: To provide a renewal method for an existing road that curtails a period needed for the renewal work of the existing road, along with a road renewed by the renewal method.SOLUTION: A renewal method for an existing road is for renewing an existing road 10 having a reinforced concrete floor slab 2 installed on two or more steel main girders 1. The renewal method for an existing road includes: a first step in which only a portion 4 of the floor slab 2 lying on the main girder is left as is, and the other portions are removed; and a second step in which a new floor slab block 6 having two or more recesses 6a on an undersurface is installed such that each of the recesses 6a is placed on the portion 4 on the two or more main girders, and the installation process of the floor slab block 6 is repeated in a direction of extension of the road, for constructing a renewed road 20.SELECTED DRAWING: Figure 4
机译:解决的问题:为现有道路提供一种更新方法,该方法可以减少现有道路的更新工作所需的时间,以及通过该更新方法进行更新的道路。解决方案:现有道路的更新方法用于更新具有在两个或多个钢主梁1上安装的钢筋混凝土楼板2的现有道路10。用于现有道路的更新方法包括:第一步,其中仅将位于主梁上的地板2的一部分4制成。保留原样,其他部分将被删除;第二步骤是,安装在底面上具有两个或更多个凹槽6a的新楼板块6,使得每个凹槽6a被放置在两个或更多个主梁的部分4上,并且安装步骤在道路的延伸方向上重复楼板块6,以建造新的道路20。选定的图纸:图4

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号