首页>
外国专利>
FIXING METHOD FOR JOINT PART STEEL OF COMPOSITE STRUCTURE, JOINT PART CONSTRUCTION METHOD AND JOINT PART STRUCTURE, ANCHOR BOLT FIXING JIG
FIXING METHOD FOR JOINT PART STEEL OF COMPOSITE STRUCTURE, JOINT PART CONSTRUCTION METHOD AND JOINT PART STRUCTURE, ANCHOR BOLT FIXING JIG
展开▼
机译:复合结构连接件的固定方法,连接件的构造方法及连接件的结构,锚杆固定夹具
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To solve a problem in a conventional fixing method for a joint part steel of a composite structure that a number of times of concrete casting increases once because a load of a joint part steel exerts, increasing the number of man-hours and extending a construction period, thus increasing costs.SOLUTION: A fixing method for a joint part steel of a composite structure fixes a joint part steel 1 by mounting the joint part steel on a column skeleton 4, and includes the steps for: forming an anchor bolt fixing jig 5 that holds an anchor bolt 2 at a prescribed position in a horizontal direction and a desired position in a vertical direction, the anchor bolt supporting the joint part steel 1 in the vertical direction; erecting the anchor bolt 2 on the column skeleton 4 using the anchor bolt fixing jig; mounting the joint part steel 1 on the anchor bolt 2; and fixing the joint part steel 1 on the column skeleton 4 using a joint part fixing jig 3 composed of a plate member suspended from the joint part steel 1 to surround the column skeleton 4.SELECTED DRAWING: Figure 1
展开▼