首页> 外国专利> Managing maintenance operations in multi-machine configurations

Managing maintenance operations in multi-machine configurations

机译:在多机配置中管理维护操作

摘要

A plan including several groups of tasks is constructed for performing maintenance on a plurality of interrelated machines. A maintenance task in a first group is caused to execute within a window of time allocated for the maintenance. A determination is made that an estimated amount of time needed to execute a second group of tasks from the several groups is more than the remaining time in the window. In response to such a determination, the execution of the second group of tasks is omitted. The execution of a post-requisite task of the first group is completed. A maintenance task in the second group is executed during a second window of time allocated for the maintenance.
机译:构建包括几组任务的计划,以对多个相互关联的机器执行维护。使第一组中的维护任务在为维护分配的时间范围内执行。确定从几组中执行第二组任务所需的估计时间大于窗口中的剩余时间。响应于这种确定,省略第二组任务的执行。第一组的后置任务的执行完成。在为维护分配的第二时间窗口内执行第二组中的维护任务。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号