首页> 外国专利> REGIONAL TRAIN CONTROL IMPLEMENTATION METHOD, TRAIN CONTROL CENTERS, AND STORAGE MEDIUM

REGIONAL TRAIN CONTROL IMPLEMENTATION METHOD, TRAIN CONTROL CENTERS, AND STORAGE MEDIUM

机译:区域列车控制实施方法,列车控制中心和存储介质

摘要

The present invention provides a regional train control implementation method, comprising: train control centers segment intervals among a plurality of train stations into a plurality of virtual centralized regions (S301); the train control centers parse information of adjacent virtual centralized region ports, the segmented virtual centralized regions being internal intervals (S303); each of the train control centers controls a plurality of train stations or relay stations (S305). Compared with the prior art in which one train control center only controls one train station or relay station, the present invention reduces the number of points of fault of train control centers, improves the reliability of the train control centers, and reduces system costs. Also provided are train control centers and a storage medium.
机译:本发明提供了一种区域列车控制的实现方法,包括:列车控制中心将多个火车站之间的间隔划分为多个虚拟集中区域(S301);列车控制中心解析相邻的虚拟集中区域端口的信息,分割的虚拟集中区域为内部区间(S303);每个列车控制中心控制多个火车站或中继站(S305)。与其中一个列车控制中心仅控制一个火车站或中继站的现有技术相比,本发明减少了列车控制中心的故障点数量,提高了列车控制中心的可靠性,并降低了系统成本。还提供了火车控制中心和存储介质。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号