Underground continuous wall grouting waterproofing method

机译:地下连续墙注浆防水方法

摘要

The present invention relates to an underground continuous wall routing waterproofing method including (S1) a step of constructing a guide wall (10) on both sides along an upper periphery where an outer wall is to be positioned; a first drilling step (S2) of drilling between the guide walls (10) to dispose a drilled region and a non-drilled region in a row; (S3) a step of injecting a reinforcing net (30) in which a grouting pipe is integrally assembled into a first receiving groove (40) secured by the first drilling step; (S4) a step of fixing a boundary film to the first receiving groove (40); (S5) a step of constructing a first concrete panel (60) by placing concrete in each first receiving groove (40) into which the reinforcing net (30) is inserted; a second drilling step (S6) of drilling the undrilled region positioned between the first concrete panels (60) and drilling a second receiving groove (40a) so as to communicate with the first concrete panel (60); (S7) a step of injecting the reinforcing net (30) in which the grouting pipe is integrally assembled into each second receiving groove (40a) secured by the second drilling step; (S8) a step of installing a second concrete panel (70) so as to be integrally connected with the first concrete panels (60) previously laid by placing concrete in the second receiving groove (40a); an earth mount digging step (S9) of forming an underground building space by digging the earth inside the built underground continuous wall; (S10) a step of performing leak inspection on an underground continuous wall (100) built in the secured underground space; and a grouting step (S11) of supplying grout to the grouting pipe (20) and blocking water leakage when water leakage occurs at a connecting part (80).
机译:本发明涉及一种地下连续墙敷设防水方法,该方法包括(S1)在沿要设置外壁的上周边在两侧构造导壁(10)的步骤。在导向壁(10)之间进行钻孔的第一钻孔步骤(S2),以将钻孔区域和非钻孔区域布置成一排; (S3)将加固网(30)注入其中的步骤,在所述加固网中将注浆管整体地组装到通过第一钻孔步骤固定的第一接收凹槽(40)中; (S4)将边界膜固定在第一容纳槽(40)上的步骤。 (S5)通过将混凝土放置在插入有加强网(30)的每个第一接收槽(40)中来构造第一混凝土板(60)的步骤;在第二钻孔步骤(S6)中,对位于第一混凝土板(60)之间的未钻孔区域进行钻孔,并在第二容纳槽(40a)上钻孔以与第一混凝土板(60)连通。 (S7)在上述第2钻孔工序中固定的各第2收容槽(40a)中,一体地注入注浆管的加强网(30)被注入的工序。 (S8)安装第二混凝土板(70),使其与通过在第二容纳槽(40a)中放置混凝土而预先放置的第一混凝土板(60)一体地连接的步骤;土方挖掘步骤(S9),其通过在所建造的地下连续壁内挖土来形成地下建筑空间。 (S10)对固定在地下空间中的地下连续壁(100)进行泄漏检查的步骤。灌浆步骤(S11),其向灌浆管(20)供给灌浆,并在连接部(80)发生漏水时,阻止漏水。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号