首页> 外国专利> DEVICE FOR SUBGRADE OF HIGH-SPEED IN AREAS WITH DEVELOPMENT OF KARST-SUFFUSION PROCESSES

DEVICE FOR SUBGRADE OF HIGH-SPEED IN AREAS WITH DEVELOPMENT OF KARST-SUFFUSION PROCESSES

机译:岩溶融合工艺开发的区域高速设备

摘要

FIELD: construction.;SUBSTANCE: invention relates to the construction, in particular to the construction and reconstruction of railways for high-speed rail transport, and can be used in the construction of railways in areas with the development of karst-suffosion processes. Device for the subgrade of the high-speed highway in areas with the development of karst-suffusion processes contains a pile-grillage foundation, including bored piles with a diameter of at least one meter installed in the subgrade base. Distance between the bored piles in the transverse profile in 4÷5 times the diameter of the pile, and the distance between the bored piles in the longitudinal direction is not less than 1.5 times the distance between them in the transverse profile. Bored piles are interconnected by bolts fixed in the pile caps. Monolithic reinforced concrete slabs with longitudinal and transverse expansion joints filled with bitumen mastic and polystyrene foam are installed on girders, while the slab freely rests on the outer girders and is rigidly attached to the central girders.;EFFECT: technical result consists in increasing the reliability and durability of the high-speed highway in areas with the development of karst-suffusion processes.;1 cl, 3 dwg
机译:技术领域本发明涉及建筑,特别是涉及用于高铁运输的铁路的建设和改建,并且可以在岩溶窒息过程发展的地区用于铁路建设。随着岩溶充填过程的发展,该地区的高速公路路基设备包含一个桩基基础,包括安装在路基基础上的直径至少为一米的钻孔桩。横向孔中的钻孔桩之间的距离为桩直径的4到5倍,并且纵向孔中的钻孔桩之间的距离不少于横向截面中​​桩之间的距离的1.5倍。钻孔桩通过固定在桩帽中的螺栓相互连接。大梁上安装了带有纵向和横向伸缩缝的整体式钢筋混凝土楼板,并填充了沥青乳香和聚苯乙烯泡沫,而该楼板则自由地搁置在外梁上,并牢固地附着在中梁上;效果:技术成果在于提高了可靠性溶岩过程发展地区的高速公路的耐久性和耐久性。; 1 cl,3 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号