首页> 外国专利> METHOD OF DETERMINING POWER VALUES OF TRAIN MOVEMENT AND TRACTION POWER SUPPLY SYSTEM

METHOD OF DETERMINING POWER VALUES OF TRAIN MOVEMENT AND TRACTION POWER SUPPLY SYSTEM

机译:确定列车行驶和牵引电源系统功率值的方法

摘要

FIELD: power supply system.;SUBSTANCE: method of determining power values of train movement and traction power supply system consists in the following. Voltages are determined on pantograph of electrically rolling stock during traction and electrical calculations and check conditions of application of recuperative braking. Energy values are calculated taking into account electric power accumulator operation modes at traction substations or linear devices by determining modes and operating episodes, voltage and current in charging and discharging modes taking into account incidental operation and power consumption of electric energy accumulators at each step of traction and electrical calculations.;EFFECT: technical result consists in improvement of accuracy of determining energy values of train movement and traction power supply system.;1 cl, 2 dwg
机译:领域:电源系统;实体:确定火车运动和牵引电源系统的功率值的方法包括以下内容。在牵引力和电气计算过程中,在电车辆的受电弓上确定电压,并检查换热制动的应用条件。通过确定模式和运行情节,在充电和放电模式下的电压和电流,并考虑到牵引的每个步骤中电能蓄能器的偶然运行和功耗,来考虑牵引变电站或线性设备中的蓄能器运行模式来计算能量值效果:技术成果在于提高了确定火车运动和牵引供电系统能量值的准确性。; 1 cl,2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号