首页> 外国专利> NUCLEAR REACTOR CORE MELT COOLING METHOD AND NUCLEAR MELT CORE COOLING CONTROL SYSTEM

NUCLEAR REACTOR CORE MELT COOLING METHOD AND NUCLEAR MELT CORE COOLING CONTROL SYSTEM

机译:核反应堆芯冷却方法及核熔芯冷却控制系统

摘要

FIELD: safety equipment; nuclear technology.;SUBSTANCE: group of inventions relates to systems for ensuring safe operation of nuclear power plants during accidents. Method of cooling melt core of nuclear reactor includes determining location of molten core fragments in reactor housing and core penetration status from information obtained from temperature sensors installed in nuclear reactor, supply of cooling liquid to reactor core, increase or decrease of volume of cooling liquid supply to active zone after fusion of reactor vessel. Degree of destruction of housing of nuclear reactor and time of beginning of melt outflow from housing into melt trap are determined. Cooling liquid is fed into melt trap body with preset time delay. Time of onset of crust formation, time of aerosol release termination, time of steam sorption completion and time of hydrogen formation are determined. Volume of coolant supply is adjusted considering thermophysical parameters of media, volume of coolant supply is adjusted considering minimum and maximum water levels in reactor shaft. There is also a cooling system for melt cooling of core of nuclear reactor.;EFFECT: group of inventions makes it possible to increase efficiency of cooling melt of core of nuclear reactor.;2 cl, 3 dwg
机译:领域:安全设备;物质:一组发明,涉及确保事故中核电厂安全运行的系统。冷却核反应堆熔融堆芯的方法包括:从核反应堆中安装的温度传感器获得的信息确定熔融堆芯碎片在反应堆壳体中的位置以及堆芯的渗透状态,向反应堆堆芯供应冷却液,增加或减少冷却液供应量反应堆容器融合后,进入活性区。确定核反应堆外壳的破坏程度和从外壳开始进入熔池的熔体开始流出的时间。冷却液以预设的时间延迟被送入熔池。确定结壳形成的开始时间,气溶胶释放终止的时间,蒸汽吸附完成的时间和氢的形成时间。考虑到介质的热物理参数来调整冷却剂的供应量,考虑反应堆竖井中的最小和最大水位来调整冷却剂的供应量。还有一个用于核反应堆堆芯冷却的冷却系统。效果:一组发明可以提高冷却核反应堆堆芯的冷却效率。2 cl,3 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号