摘要

FIELD: construction.;SUBSTANCE: invention relates to hydraulic engineering devices and can be used for construction of temporary dams on rivers with unstable water level. General principle of the dam operates as follows: sections of the dam, which include two rigid rectangular frames, pivotally attached in the upper part at an angle, the side of the section facing the water is waterproof, and as a whole form a triangular prism. Frames are made with additional stiffeners. Sections, screw piles, rigid guides are made of high-alloy steel or metal, with anticorrosive coating, for example zinc-plated or painted iron. Reinforced concrete piers are made at one and / or on the other bank at angle of 30°±15° downstream of the river. On the frontal line of the moorings there are mini-piles or screw piles in one line across the river flow and are the support of sections, to which the sections are fixed with the lower base from the frontal side of the sections, wherein one pile is a support for two sections, and the base of the opposite side of sections is wide, for example a plate is welded to the base. In the lower part of the front section there is a strong shutter, for example, metal or PVC, with the possibility of lifting-lowering along side guides installed on the front frame. At least one section is made with possibility of passage of commensurate vessels from one passage to another. On the front side of this section, consisting of two plates, lower stationary and upper movable, there is a mechanism for reducing and lifting the plate by means of ropes, by one end attached to hooks of top plate, overturned through rotating units, mounted on top points of section, and by other end ropes are fixed to counterweight located on opposite support frame. Counterweight with its weight is 10–20 % higher than that of top plate. Strong round element, for example a pipe, is attached to the upper face of the plate so that the bottom of the boat does not suffer when passing into another passage. Invention ensures reduction of time and labor costs for bringing the structure into working state, increase of reliability and reinforcement of the structure, compactness of the structure when folded for transportation and watertightness of the dam at available components.;EFFECT: technical task of the proposed invention is creation of seasonal water reservoirs, which prevent river shallowing during dry period, and provision of water to farms.;9 cl, 5 dwg
机译:技术领域本发明涉及水力工程装置,可用于在水位不稳定的河流上建造临时水坝。大坝的一般原理如下:大坝的各个部分,包括两个刚性的矩形框架,以一定角度枢轴连接在上部,该部分的面向水的一侧是防水的,整体上形成一个三棱柱。框架由附加的加强筋制成。型材,螺旋桩,刚性导向器由高合金钢或金属制成,并带有防腐蚀涂层,例如镀锌或喷漆的铁。钢筋混凝土墩在河的下游以30°±15°的角度在另一岸和/或另一岸建造。在系泊的前线上,在一条河流中的一条线上有微型桩或螺旋桩,是部分的支撑,这些部分从这些部分的前侧通过下基座固定在这些部分上,其中一堆是两个部分的支撑,部分相对侧的底部较宽,例如将一块板焊接到底部。在前部的下部,有一个坚固的百叶窗,例如金属或PVC,可以沿着安装在前框架上的侧导板升降。制成至少一个部分,使相当的船只从一个通道通向另一个通道。在此部分的前侧,由两块板组成,下部固定件和上部可移动件,有一个机构,用于通过绳索减小和提起板,一端固定在顶板的挂钩上,通过旋转装置翻转,安装在截面的顶部,绳索通过另一端固定到位于相对支撑框架上的配重。配重的重量比顶板的重量高10-20%。坚固的圆形元件(例如管子)连接到板的上表面,以使船的底部在进入另一个通道时不会受到影响。本发明确保减少了使结构进入工作状态的时间和人工成本,增加了结构的可靠性和加固性,折叠后的结构紧凑性便于运输,并且在可用组件处实现了大坝的水密性。发明是创造季节性的水库,以防止干旱时期的河流变浅,并为农场供水。; 9 cl,5 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号