Robert Street Dam Removal - Restoring Migratory Fish Passage on the Raritan River, New Jersey

机译:罗伯特街大坝拆除-恢复新泽西州拉里坦河上的Fish游鱼类

获取原文

摘要

The Robert Street Dam was successfully removed from the Raritan River in central New Jersey to restore migratory (anadromous) fish passage. This reconstructed concrete gravity dam had a structural height of approximately 7.5 feet, a crest length of 255 feet with a width of 23 feet, which included a 17.5-foot wide rock-backfilled section between two parallel rows of waler-supported steel sheet piles driven into bedrock that encased the original circa 1915 dam. To remove the dam, numerous technical and permitting challenges had to be resolved, including inadequate bridge load capacity that precluded heavy equipment access to the site. Technical obstacles that were overcome during the dam removal included managing the work around frequent upriver reservoir releases, the laborious extraction of over 300 individual sheet piles using two different hydraulic vibratory driver/extractors, and conveyance of over 700 tons of concrete and 70 tons of steel offsite over the five-week removal period.
机译:罗伯特街大坝已成功从新泽西州中部的拉里坦河上撤下,以恢复mi游的(过水的)鱼类通过。这座重建的混凝土重力坝的结构高度约为7.5英尺,峰顶长度为255英尺,宽度为23英尺,其中包括两排行桩支撑的钢板桩之间的17.5英尺宽的岩石回填段包裹在包围约1915年大坝的基岩中。为了拆除大坝,必须解决众多技术和许可挑战,包括桥梁承载能力不足,无法使用重型设备进入现场。大坝拆除过程中克服的技术障碍包括:管理频繁的上游水库放水工作,使用两个不同的液压振动驱动器/提取器费力地抽出300多个单独的板桩以及运送700吨以上的混凝土和70吨的钢材在五周的撤除期内异地工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号