首页>
外国专利>
OPTIMIZED EQUIPMENT ARRANGEMENT SYSTEM, OPTIMIZED EQUIPMENT ARRANGEMENT SUPPORT SYSTEM, MARKET AND MARKET MANAGEMENT METHOD USING OPTIMIZED EQUIPMENT ARRANGEMENT SYSTEM
OPTIMIZED EQUIPMENT ARRANGEMENT SYSTEM, OPTIMIZED EQUIPMENT ARRANGEMENT SUPPORT SYSTEM, MARKET AND MARKET MANAGEMENT METHOD USING OPTIMIZED EQUIPMENT ARRANGEMENT SYSTEM
展开▼
机译:优化的设备布置系统,优化的设备布置支持系统,使用优化的设备布置系统的市场和市场管理方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
To realize optimized relocation from existing equipment to the latest equipment or other reusable equipment, in which an optimized equipment arrangement is configured and the optimized relocation from the existing equipment to the latest equipment considers not only energy consumption efficiency but also other factors, from the point of view of the entire system.SOLUTION: An optimized equipment arrangement system is configured: to obtain market service amount information from energy saving conversion amount information, relocation cost information required for relocation, and market service information to obtain three factors of relocation effect; to form optimized arrangement information of energy saving base arrangement equipment in a base group based on the three factors of relocation effect; and to relocate the energy saving base arrangement equipment to the current base arrangement equipment arranged at the contract base in the base group to configure the optimized equipment arrangement in the base group based on the optimized arrangement information in the base loop.SELECTED DRAWING: Figure 1
展开▼