首页> 外国专利> How to reconstruct the lining part of the existing two-lane road tunnel

How to reconstruct the lining part of the existing two-lane road tunnel

机译:如何重建现有两车道公路隧道的衬砌部分

摘要

PROBLEM TO BE SOLVED: To exhibit excellent durability while exhibiting advantages that the construction cost is low, the construction period is short, the cross section of the tunnel after repair is not reduced, and the passage of vehicles in the tunnel can be secured even during repair. To provide a method of remodeling the lining part of a tunnel that can construct a new inner wall surface. SOLUTION: This is a method of remodeling an lining portion of an existing two-lane road tunnel, and the cutting work comprises a cutting process using a cutting machine 4 provided with a drum cutter 41 having a large number of bits on the peripheral surface. The lining formwork 5 is arranged so that the inner wall surface construction work can move relative to the protector 2 in the work space 3 formed between the inner wall surface of the tunnel 1 and the outer wall surface of the protector 2. It consists of the lining concrete casting process used. [Selection diagram] Fig. 1
机译:要解决的问题:在表现出优异的耐久性的同时,还具有以下优点:建造成本低,建造周期短,维修后隧道的横截面不减小,甚至在行驶期间也能确保车辆通过修理。提供一种重构隧道衬砌部分的方法,该方法可以构造新的内壁表面。解决方案:这是一种改造现有两车道公路隧道衬砌部分的方法,并且切割工作包括使用切割机4进行的切割过程,该切割机4的鼓形切割机41的圆周表面上有大量钻头。衬砌模板5被布置成使得内壁表面构造工作能够在形成于隧道1的内壁表面和保护器2的外壁表面之间的工作空间3中相对于保护器2移动。衬砌采用混凝土浇筑工艺。 [选择图]图1

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号