首页>
外国专利>
Construction management equipment, construction management system, work machine, construction management method and program
Construction management equipment, construction management system, work machine, construction management method and program
展开▼
机译:施工管理设备,施工管理系统,作业机械,施工管理方法和程序
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To appropriately set a goal for each unit time of each of a plurality of work machines. SOLUTION: In a construction management system 9, a construction management device 10 includes a current terrain acquisition unit 1001 for acquiring the current terrain at a construction site, a final design surface acquisition unit 1002 for acquiring a final design surface at the construction site, and a construction site. The construction area acquisition unit 1003 that acquires the construction area of the work machine, the target work amount acquisition unit 1004 that acquires the target work amount per unit time of the work machine, the final design surface, the current topography, the construction area, and the construction area. An intermediate design surface generation unit 1005 that generates an intermediate design surface for a work machine based on a target work amount per unit time, and a notification processing unit 1006 that notifies the intermediate design surface to the operator of the work machine. It has a CPU 100. [Selection diagram] Fig. 2
展开▼