首页> 外国专利> Installation method of temporary cut-off structure used for pier repair / reinforcement work

Installation method of temporary cut-off structure used for pier repair / reinforcement work

机译:用于墩台维修/加固工程的临时隔断结构的安装方法

摘要

PROBLEM TO BE SOLVED: To provide a method for installing a temporary cut-off structure used for pier repair / reinforcement work, which can efficiently construct a temporary cut-off structure on a water area. SOLUTION: After a lower temporary cut-off structure 2a is installed in a water area, a work scaffold 4 is lowered to an upper position of a lower temporary cut-off structure 2a installed in the water area, and the lowered work scaffolding 4a is used. Using the scaffolding 4 as a scaffold, the upper temporary cut-off structure 2b, which is the upper side of the temporary cut-off structure 2, is directly constructed on the lower temporary cut-off structure 2a. [Selection diagram] FIG. 9
机译:要解决的问题:提供一种用于码头维修/加固工作的临时截断结构的安装方法,该方法可以在水域上有效地构造临时截断结构。解决方案:将下部临时隔离结构2a安装在水域中之后,将工作脚手架4降低到安装在水域中的下部临时隔离结构2a的上部位置,并将降低的工作脚手架4a用过的。使用脚手架4作为脚手架,将上临时切断结构2b即下临时切断结构2的上侧直接构造在下临时切断结构2a上。 [选择图] 9

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号