首页> 外国专利> Temporary cut-off structure used for bridge pier repair and reinforcement work

Temporary cut-off structure used for bridge pier repair and reinforcement work

机译:用于桥墩维修和加固工作的临时隔断结构

摘要

To provide a cofferdam structure used for maintenance and reinforcement work of a bridge pier on a complete water cut-off structure.SOLUTION: A plurality of divided wall members 2 form a cofferdam structure A used for bridge pier maintenance and reinforcement work, which is configured in a cylindrical body surrounding the outer periphery of a bridge pier 1, by being connected in the circumferential direction and the height direction of the bridge pier 1 via a water cut-off member 4. The water cut-off member 4 interposed between the adjacent divided wall members 2 is the cofferdam structure used for bridge pier maintenance and reinforcement work, and is composed of a three-layer structural material with a water-swelling seal 6 attached to the front and back surfaces of a packing 5.SELECTED DRAWING: Figure 2
机译:提供一种用于在完整的止水结构上进行桥墩的维护和加固工作的围堰结构。解决方案:多个分隔壁构件2形成用于桥墩的维护和加固工作的围堰结构A,其构造为隔水构件4在隔着桥墩1的外周的筒状体上经由除水构件4在桥墩1的周向上和高度方向上连接。隔水构件4夹在相邻的之间。分隔壁构件2是用于桥墩维护和加固工作的围堰结构,由三层结构材料组成,在填料5的正面和背面分别贴有水溶胀密封垫6。 2

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号