首页> 外国专利> SLIDING BASE ISOLATION BEARING STRUCTURE DURING CONSTRUCTION, AND CONSTRUCTION METHOD FOR BASE ISOLATION BUILDING

SLIDING BASE ISOLATION BEARING STRUCTURE DURING CONSTRUCTION, AND CONSTRUCTION METHOD FOR BASE ISOLATION BUILDING

机译:施工中滑行基础隔震支座结构及基础隔断房屋的施工方法

摘要

To provide a sliding base isolation bearing structure during construction and a construction method of a base isolation building capable of reducing construction labor and easily erecting a steel beam between steel columns even by tolerance accumulation.SOLUTION: In a sliding base isolation bearing structure 100 at the time of construction constituted by a lower structure 20 and an upper structure 30 of a building, a sliding base isolating device 10 interposed therebetween, and fixing jigs 50, 50A, the sliding base isolation device 10 includes: an upper shoe 1 and a lower shoe 2 having sliding surfaces having curvatures; and a steel slider 3 arranged between the upper shoe 1 and the lower shoe 2 and having upper and lower surfaces having curvatures. The lower shoe 2 is mounted on the lower structure 20 without being fixed by bolts while the upper structure 30 is mounted on the upper shoe 1 without being fixed by bolts, and the upper shoe 1 and the lower shoe 2 are temporarily fixed in a state in which relative movement is regulated by a plurality of fixing jigs 50, 50A.SELECTED DRAWING: Figure 1
机译:提供一种在施工过程中可滑动的基础隔震支座结构,以及一种即使在公差累积的情况下也能够减少建筑劳力并易于在钢柱之间竖立钢梁的基础隔断建筑的施工方法。在建筑时,由建筑物的下部结构20和上部结构30,置于其间的滑动基座隔离装置10,以及固定夹具50、50A构成,该滑动基座隔离装置10包括:上靴1和下靴2具有滑动表面,其具有曲率;钢制滑块3,其配置在上滑靴1与下滑靴2之间,且其上下表面具有曲率。下靴2不通过螺栓固定就安装在下部结构20上,而上构件30不通过螺栓固定在上部鞋1上安装,并且上靴1和下靴2暂时固定在状态下。其中相对运动由多个固定夹具50、50A调节。图1

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号