To provide a Chinese medicine treatment facility.SOLUTION: A Chinese medicine treatment facility including a processing pedestal is configured such that: a washing housing is installed in an inner wall of the processing pedestal; a washing pipe is fixedly installed in the washing housing; some pairs of washing vertical pipes extending downward are connectively installed on the bottom of the washing pipe; a shower head is fixedly installed in the bottom of the washing vertical pipe; the left terminal of the washing pipe penetrates into the left end surface of the processing pedestal, and the terminal is fixedly installed with a pressure pump; a conveyance housing installed by extending to left and right is connectively installed in the bottom wall of the washing housing; the conveyance housing penetrates into the left end surface of the processing pedestal, and the left end surface of the processing pedestal is connectively installed with a material conveyance frame; a conveyance groove connectively installed in the conveyance housing is installed in the material conveyance frame; a turning shaft entering the conveyance housing is turnably engaged and attached into the conveyance groove; and a conveyance spiral propeller is fixedly installed in a circumferential direction above the turning shaft.SELECTED DRAWING: Figure 1
展开▼