首页>
外国专利>
Construction management method of earth pressure shield method, construction management equipment and earth pressure shield excavator
Construction management method of earth pressure shield method, construction management equipment and earth pressure shield excavator
展开▼
机译:土压盾构法施工管理方法,工程管理设备及土压盾构挖掘机
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a construction management method of soil pressure type shield construction capable of aiming a rationalization of the injection method of a mud-added material toward excavated soil in a chamber, a construction management device and a soil pressure type shield drilling machine.SOLUTION: The construction management method of soil pressure type shield construction includes: an estimation step S1 of estimating a plastic flow state of excavated soil in a chamber for each combination of parameters by performing a parameter study by particle method analysis of setting an injection condition of a mud-added material as a parameter before drilling beforehand; an evaluation step S2 of evaluating the plastic flow state of excavated soil in the chamber in drilling; and an injection step S3 of selecting a predetermined injection condition suitable for the plastic flow state evaluated by the evaluation step S2 from estimated results estimated by the estimation step S1 and injecting the mud-added material into excavated soil in the chamber on the selected injection condition.SELECTED DRAWING: Figure 1
展开▼