首页>
外国专利>
Construction cost estimation system and slide amount calculation method
Construction cost estimation system and slide amount calculation method
展开▼
机译:工程造价估算系统及工程量计算方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a construction cost integration system capable of efficiently calculating total slide amount and inflation slide amount.SOLUTION: The construction cost integration system is a system for calculating slide amount in a public construction work, which includes a slide amount calculation unit 140. The slide amount calculation unit 140 copies a construction work design document of an object construction work as a design document for estimating remaining construction cost before change and a design document for estimating remaining construction cost after change and registers performance quantity at base date in the copied design document for estimating remaining construction cost before change and the design document for estimating remaining construction cost after change. The construction cost integration system calculates the slide amount based on the design document for estimating remaining construction cost before change and the design document for estimating remaining construction cost after change in which the performance quantity has been registered.SELECTED DRAWING: Figure 1
展开▼