In an entity consisting of a power receiving business and a power generation business, a self-contracted transfer plan is created by considering the uncertainties of multiple production schedules at a manufacturing plant, and power demand is changed by adjusting the production schedule. To keep the same amount as planned. An energy management device for an enterprise having a power generation business and a power reception business connected to an electric power system, wherein an EMS is installed in the power generation business and the power reception business, an AEMS is installed in the business, and the power reception business is installed. EMS predicts the power transition of each production line on the scheduled date and classifies the operation schedule of its own production line on the scheduled date into a fixed schedule, an undetermined schedule, and an adjustable schedule. The determined demand on the scheduled date and the maximum demand in consideration of the undetermined schedule are determined from the classified operation schedule and the power transition on the scheduled date reported from the EMS, and the difference is calculated as the difference between the maximum demand and the contracted power of the power receiving establishment. The self-contracted transmission output to the power receiving establishment is set within the minimum self-contracted amount and the determined demand, and the EMS of the power generation MS is characterized by generating in accordance with the self-wheeling schedule output that defines.
机译:在由受电业务和发电业务组成的实体中,通过考虑制造工厂的多个生产计划的不确定性来创建自承包的转移计划,并通过调整生产计划来更改电力需求。保持与计划相同的金额。用于具有与电力系统连接的发电业务和受电业务的企业的能量管理设备,其中在发电业务和受电业务中安装了EMS,在该业务中安装了AEMS,并且电力接收业务已安装。 EMS会预测每个生产线在预定日期的电源转换,并将其自己的生产线在预定日期的运行时间表分类为固定时间表,未确定时间表和可调整时间表。根据未分类的计划表确定的计划日期需求和最大需求是从EMS报告的分类运行计划和计划日期的电源转换中确定的,并且将差异计算为最大需求与受电机构的合同规定的权力。到受电设施的自承包输出输出被设置在最小自承包量和所确定的需求之内,并且发电MS的EMS的特征在于根据定义的自转时间表输出来生成。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号