首页> 外国专利> Construction method of viaduct, installation method and removal method of container and support used for this

Construction method of viaduct, installation method and removal method of container and support used for this

机译:高架桥的建造方法,用于此的集装箱和支座的安装方法和拆除方法

摘要

PROBLEM TO BE SOLVED: To provide a viaduct construction container useful for constructing a viaduct in a satisfactorily efficient and safe manner even at construction site where a sufficient space for disposing a heavy machine such as a crane cannot be obtained to the side of the viaduct construction site.SOLUTION: Disclosed container is used for constructing a viaduct which has a middle beam. The container includes: a storage part capable of storing a plurality of support work members; and a frame part constituting the storage part. The frame part constitutes a support work for constructing a structure higher than the middle beam together with the plurality of support work members in a state being fixed to the middle beam.SELECTED DRAWING: Figure 9
机译:解决的问题:提供一种高架桥施工容器,即使在无法获得足够空间放置重型机械(例如起重机)的建筑工地的情况下,也可用于以令人满意的有效和安全的方式构造高架桥。解决方案:封闭的容器用于构造具有中梁的高架桥。该容器包括:能够容纳多个支撑工作构件的容纳部;以及能够容纳多个支撑工作构件的容纳部。框架部分构成存储部分。框架部分构成了用于支撑高于中间梁的结构的支撑工件,该多个支撑工件在固定至中间梁的状态下与多个支撑工件一起构造。图9

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号