首页> 外国专利> Method and cogeneration installation in heat generating plants, preferably equipped with water-tube boilers

Method and cogeneration installation in heat generating plants, preferably equipped with water-tube boilers

机译:方法和热电联产设备安装在热电厂中,最好配备水管锅炉

摘要

The method according to the invention characterized in that while maintaining thermal power of the water-tube boiler (1), water stream is decreased in relation to the nominal stream thus water heating increases and then heated water is throttled in the valve (16) to the saturation temperature - the temperature of formation, generating saturated steam, whereby the saturated steam after being overheated in the diaphragm heat exchanger (19), at the boiler flue gas exhaust pass (1), to the temperature above the saturation temperature, feeds steam condensing turbine (20) and a wet steam exiting the turbine (20) after condensation in condenser fed (22) by the return water from the external circuit of distribution (11) and then cooled in the air heaters (24), is then returned by pipeline (12) to external circuit of distribution (11). Cogeneration installation in heat plants, especially those equipped with water-pipe boilers, in which in the water pipeline behind the boiler on the inlet to the steam and water separator vessel an expansion valve is installed, and the steam and water separator is connected in the lower part with the water drainage pipeline and in the upper part with a saturated steam pipeline, while the steam pipeline connects a series: the diaphragm steam superheater placed in the course of exhaust pass from the boiler, the steam condensing turbine and the condenser, according to the invention is characterized in that has a diaphragm condenser (22) (22-1) connected condensate pipeline (25) to the pump (23) via an air heater (24) and to an intermediate water tank (13) from which the condensate drainage pipeline (12) with a pump (14) connects with the return water pipe from the external circuit of distribution (11), the diaphragm condenser (22-1) is equipped with a cooling circuit consisting of a control valve (9) and a pipeline (10) connected by a flow diaphragm condenser (22-1) with a return water distribution pipe (8).
机译:根据本发明的方法,其特征在于,在保持水管锅炉(1)的热功率的同时,水流相对于标称流减少,因此水的加热增加,然后将加热的水在阀(16)中节流至饱和温度-生成饱和蒸汽的地层温度,由此饱和蒸汽在膜片式换热器(19)中在锅炉烟气排气通道(1)中过热后达到饱和温度以上,以供入蒸汽冷凝后的汽轮机(20)和湿蒸汽在冷凝器中凝结后离开汽轮机(20),该湿汽由来自分配器(11)的外部回路的回水送入(22),然后在空气加热器(24)中冷却,然后返回通过管道(12)到达配电系统(11)的外部电路。热电厂的热电联产安装,尤其是配备水管锅炉的热电厂,其中在锅炉后面的水管中,在蒸汽和水分离器容器的入口处安装了一个膨胀阀,并且蒸汽和水分离器连接在下部与排水管道相连,上部与饱和蒸汽管道相连,而蒸汽管道则连接着一系列的管道:位于排气过程中的隔膜蒸汽过热器从锅炉,蒸汽冷凝式涡轮机和冷凝器排出,本发明的特征在于,具有隔膜冷凝器(22)(22-1),该隔膜冷凝器通过空气加热器(24)连接到泵(23),并且连接到中间水箱(13),冷凝水管道(25)连接到冷凝水管道(25)。带有泵(14)的冷凝水排水管道(12)与来自分配管道(11)的外部回路的回水管道相连,隔膜冷凝器(22-1)配备有由冷凝器组成的冷却回路阀(9)和通过流动隔膜冷凝器(22-1)与回水分配管(8)连接的管道(10)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号