首页> 外国专利> Method for conducting preparatory works in a thick bed of coal under the fall of roof

Method for conducting preparatory works in a thick bed of coal under the fall of roof

机译:在顶板倒下的厚煤层中进行准备工作的方法

摘要

the application concerns a method of preparatory works in thick board coal cave in, when the upper layer is selected without collateral with the stroke beams.this is,that excavation paving (4 ') is under the bracket (6), with przypinanej shelf carbon and / or lower zone workings zawau0142owego (with) by injection of progressively to progress ancestor (4") mixture of binding short holes iniekcyjnymi.in addition, with the workings chodnikowego (4 ') iniekcyjnymi long holes (10) zatu0142acza in upper zone gruzowiska zawau0142owego () neighborhood keystone mixture binding measures of time binding regulowanym according to capacity gruzowiska zawau0142owego (with).advantageously wyrobisko paving (4 ') is carried out after upadzie,and injection of long holes iniekcyjnymi (10) pursues acting successively wzniosie workings chodnikowego (4 ') in mutual distances (l1) dependent on the capacity gruzowiska zawau0142owas (with).
机译:该申请涉及在厚板煤洞穴的准备工作中的方法中,当上层无需抵押选择与笔划beams.this是,挖掘铺路(4“)是托架(6)下,与przypinanej货架碳和/或下部区域工作区zawa u0142owego(带有),通过逐步注入到进度祖先(4 “)混合物中来绑定短孔iniekcyjnymi。此外,还有工作区chodnikowego(4')iniekcyjnymi长孔(10)zat在上部区域gruzowiska zawa中的邻域基石混合物根据容量gruzowiska zawa(与)绑定时间绑定regulowanym的结合措施。有利地进行wyrobisko摊铺(4'),然后进行adadkie并注入长孔iniekcyjnymi (10)取决于容量gruzowiska zawa u0142owas(with),在相互距离(l1)中连续作用wzniosie运作chodnikowego(4')。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号