首页> 外国专利> Computer-implemented method for re-calibrating at least one yaw-angle of a wind turbine, respective system, computer-implemented method for wind park optimization, and respective wind park

Computer-implemented method for re-calibrating at least one yaw-angle of a wind turbine, respective system, computer-implemented method for wind park optimization, and respective wind park

机译:用于重新校准风力涡轮机的至少一个偏航角的计算机实现的方法,相应的系统,用于风电场优化的计算机实现的方法以及相应的风电场

摘要

To solve the problem of a mis-calibration of a wind turbine a computer-implemented method for re-calibrating at least one yaw-angle of a wind turbine starting from an initial yaw-angle calibration of said wind turbine, based on determining a turbulence intensity estimation value (20) related to said appropriate yaw-angle (10), wherein the turbulence intensity (TI) being a ratio of wind speed deviation to average wind speed over a pre-determined period of time. Further, to solve the problem of a mis-calibration of a wind turbine a system for re-calibrating at least one yaw-angle of a wind turbine based on above re-calibration method. Further, to solve the problem of a management of a wind park below optimum a computer-implemented method for wind park optimization based on simulation calculation including turbulence intensity estimation values (20) estimating said at least one effecting wind turbine (101,102,103) to suffer from wake from said at least one effected wind turbine (100,101,102). Further, to solve the problem of a management of a wind park below optimum a wind park, including a management system for optimizing that wind park based on above optimization method. Moreover, present invention relates to a computer-readable medium comprising such methods.
机译:为了解决风力涡轮机的不正确校准的问题,一种基于计算机的方法,用于基于确定湍流,从所述风力涡轮机的初始偏航角校准开始重新校准风力涡轮机的至少一个偏航角。与所述适当的偏航角(10)有关的强度估计值(20),其中湍流强度(TI)是在预定时间段内的风速偏差与平均风速之比。此外,为了解决风力涡轮机的不正确校准的问题,提供了一种基于上述重新校准方法来重新校准风力涡轮机的至少一个偏航角的系统。此外,为了解决风电场管理低于最优的问题,基于模拟计算的用于风电场优化的计算机实现的方法包括模拟估计所述至少一个影响风力涡轮机(101,102,103)遭受的湍流强度估计值(20)。从所述至少一个受影响的风力涡轮机(100,101,102)中唤醒。进一步地,为了解决风电场管理低于最优风电场的问题,包括基于上述优化方法对风电场进行优化的管理系统。此外,本发明涉及一种包括这种方法的计算机可读介质。

著录项

  • 公开/公告号AU2018293722A1

    专利类型

  • 公开/公告日2020-01-30

    原文格式PDF

  • 申请/专利权人 RWE RENEWABLES INTERNATIONAL GMBH;

    申请/专利号AU20180293722

  • 发明设计人 CORTIANA GIORGIO;

    申请日2018-06-28

  • 分类号F03D7/02;F03D17;F03D7/04;

  • 国家 AU

  • 入库时间 2022-08-21 11:12:34

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号