首页>
外国专利>
BOM METHOD OF MANAGING BILL OF MATERIAL ON HULL STRUCTURE IN SHIP DESIGN FOR IMPLEMENTING SMART FACTORY
BOM METHOD OF MANAGING BILL OF MATERIAL ON HULL STRUCTURE IN SHIP DESIGN FOR IMPLEMENTING SMART FACTORY
展开▼
机译:实施智能工厂的船舶设计中的船体结构管理的BOM方法。
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a method of managing design hull bill of material (BOM) for implementing a smart factory. The method comprises the following steps of: establishing and storing a design schedule according to a reference schedule, reflecting various prior information in modeling to store the reflected modeling, and inputting production technique data into a design integrated DB in order to build a ship; extracting design information and member information from the design integrated DB to generate and store hull BOM by line in an HIBS DB; checking a BOM Diff of the hull BOM to confirm data matching; and generating design data and 3D model information according to information provided from the design integrated DB to transmit hull BOM in which the data matching is confirmed to the a design information transmission DB so that optional modification is impossible when the hull BOM is generated and data alignment of hull BOM can be ensured by a hull BOM itself check logic or an SAP check logic.
展开▼