首页> 外国专利> METHOD OF ERECTION AND ARRANGEMENT OF A SINGLE-SPAN UNDERGROUND METRO STATION OF AN OPEN METHOD OF PERFORMING WORKS

METHOD OF ERECTION AND ARRANGEMENT OF A SINGLE-SPAN UNDERGROUND METRO STATION OF AN OPEN METHOD OF PERFORMING WORKS

机译:一种开放式工作方法的单跨地下地铁站的架设和布置方法

摘要

FIELD: construction.;SUBSTANCE: invention relates to construction of underground metro stations by open method. Method of erection of single-span subway station of open method of works execution consists in creation of trench, structure of walls fixing is determined by depth of station laying and engineering-geological conditions of construction, and accommodation within a single-span multilevel subway station pit, comprising a roof slab, a floor slab, side walls and a tray (foundation) slab, as well as rails and passenger platforms with subplatform spaces, wherein concreting the single-span closed frame structure is performed by the "bottom-up" method from the tray slab, then, side walls, floor slab and roof slab are erected, roof slab and floor slab are fixed on frame side walls, wherein the closed frame structure is divided by the floor slab into two tiers, upper and lower, upon completion of erection of station lining on each tier a single rail track and a passenger platform are built such that the track and the passenger platform of the upper tier are located, respectively, above rail and passenger platform of lower tier, at that, under passenger platforms of upper and lower tiers technical rooms are arranged, as well as technical result is achieved by the fact that the single-span metro station of the open method of performing works is a construction structure, arranged inside the pit and containing a roof slab, a floor slab, side walls and a tray slab, as well as rails and passenger platforms with subplatform spaces, wherein the station is made in the form of a single-span closed frame structure of monolithic reinforced concrete, in which the roof slab and floor slab are supported by side walls of the frame, wherein the closed frame structure is divided by the floor slab into two tiers, upper and lower, each of which comprises a single rail track and a passenger platform, wherein rail track and passenger platform of upper tier are located above track and passenger platform of lower tier, respectively, and technical rooms are arranged under passenger platforms of upper and lower tiers.;EFFECT: technical result consists in improvement of technological effectiveness and speed of construction, possibility of placing new metro stations on smaller areas in constrained conditions of urban development and reduced volume of developed soil.;2 cl, 1 dwg
机译:技术领域本发明涉及通过开放方法来建造地下地铁站。开放式单跨地铁站的架设方法工程的执行方式包括开挖沟渠,固定墙体的结构取决于站的铺设深度和施工的工程地质条件,以及单跨多层地铁站内的住宿条件。基坑,包括屋顶板,地板板,侧壁和托盘(基础)板,以及具有亚平台空间的轨道和乘客平台,其中通过“自下而上”来浇筑单跨封闭框架结构从托盘平板的方法,然后,竖立侧壁,地板平板和屋顶平板,将屋顶平板和地板平板固定在框架侧壁上,其中,封闭的框架结构被地板平板分为上下两层,在完成每层车站衬砌的架设后,将建造一条铁路轨道和一个乘客平台,以使上层的轨道和乘客平台分别位于铁路和铁路上方。下层的乘客平台,即在上层和下层的乘客平台下方布置技术室,并且通过开放式演艺的单跨地铁站是一种建筑结构这一事实来达到技术效果,安装在矿坑内,包含屋顶板,地板板,侧壁和托盘板,以及具有亚平台空间的轨道和乘客平台,其中,车站采用单跨度封闭框架结构,整体式钢筋混凝土,其中屋顶板和楼板由框架的侧壁支撑,其中封闭的框架结构被楼板分为上下两层,每层包括一条铁轨和一条乘客平台,上层的铁路轨道和乘客平台分别位于下层的轨道和乘客平台之上,技术室布置在上层的乘客平台之下效果:技术成果包括提高技术效率和施工速度,在城市发展受限的条件下以及在减少的已开发土壤量的情况下将新地铁站放置在较小区域的可能性。; 2 cl,1 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号