首页> 外文OA文献 >Downtime reduction analysis of the Australia Post flat mail optical character reader
【2h】

Downtime reduction analysis of the Australia Post flat mail optical character reader

机译:澳大利亚邮政扁平邮件光学字符阅读器的停机时间减少分析

摘要

Machine downtime, whether planned or unplanned, is intuitively costly to manufacturing organisations, but is often very difficult to quantify. The available literature showed that costing processes are rarely undertaken within manufacturing organisations. Where cost analyses have been undertaken, they generally have only valued a small proportion of the affected costs, leading to an overly conservative estimate. This thesis aimed to develop a cost of downtime model, with particular emphasis on the application of the model to Australia Post’s Flat Mail Optical Character Reader (FMOCR). The costing analysis determined a cost of downtime of $5,700,000 per annum, or an average cost of $138 per operational hour.ududThe second section of this work focused on the use of the cost of downtime to objectively determine areas of opportunity for cost reduction on the FMOCR. This was the first time within Post that maintenance costs were considered along side of downtime for determining machine performance. Because of this, the results of the analysis revealed areas which have historically not been targeted for cost reduction. Further exploratory work was undertaken on the Flats Lift Module (FLM) and Auto Induction Station (AIS) Deceleration Belts through the comparison of the results against two additional FMOCR analysis programs. ududThis research has demonstrated the development of a methodical and quantifiable cost of downtime for the FMOCR. This has been the first time that Post has endeavoured to examine the cost of downtime. It is also one of the very few methodologies for valuing downtime costs that has been proposed in literature. The work undertaken has also demonstrated how the cost of downtime can be incorporated into machine performance analysis with specific application to identifying high costs modules. The outcome of this report has both been the methodology for costing downtime, as well as a list of areas for cost reduction. In doing so, this thesis has outlined the two key deliverables presented at the outset of the research.
机译:机器停机时间,无论是计划内还是计划外的停机时间,对制造组织而言都非常昂贵,但通常很难量化。现有文献表明,成本核算过程很少在制造组织内进行。在进行了成本分析的地方,它们通常只估计了受影响成本的一小部分,从而导致了过于保守的估计。本文旨在开发一个停机成本模型,特别强调该模型在澳大利亚邮政的扁平邮件光学字符阅读器(FMOCR)中的应用。成本分析确定每年的停机成本为5,700,000美元,或每个运营小时的平均成本为138美元。 ud ud该工作的第二部分着重于利用停机成本来客观地确定降低成本的机会领域在FMOCR上。这是Post内部第一次在停机时间期间考虑维护成本以确定机器性能。因此,分析结果显示了历史上从未将降低成本作为目标的领域。通过将结果与另外两个FMOCR分析程序进行比较,对平板举升模块(FLM)和自动感应站(AIS)减速带进行了进一步的探索性工作。 ud ud这项研究已经证明了FMOCR的系统停机和可量化的停机成本的发展。这是Post首次尝试检查停机成本。这也是文献中提出的评估停机时间成本的极少数方法之一。所开展的工作还证明了停机时间的成本可以如何结合到具有特定应用的机器性能分析中,以识别高成本的模块。该报告的结果既是减少停机时间的方法,又是减少成本的领域清单。为此,本文概述了研究开始时提出的两个关键交付成果。

著录项

  • 作者

    Fox James P.;

  • 作者单位
  • 年度 2007
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"en","name":"English","id":9}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号