摘要

Collaborative working methods offer the hope of reduced waste, lower tendering costs and improved outputs. The costs of tendering may be influenced by the introduction of different working methods. Transaction cost economics appears to offer an analytical framework for studying the costs of tendering, but it is more to do with providing explanations at the institutional/industry level, not at the level of individual projects. Surveys and interviews were carried out with small samples in UK. The data show that that while tendering costs are not necessarily higher in collaborative working arrangements, there is no correlation between costs of tendering and the way the work is organized. Practitioners perceive that the benefits of working in collaborative procurement routes far outweigh the costs. Tendering practices can be improved to avoid waste, and the suggested improvements include restricting selective tendering lists to 23 bidders, letting bidders know who they are competing with, reimbursing tendering costs for aborted projects and ensuring that timely and comprehensive information is provided to bidders.
机译:协作的工作方法有望减少浪费,降低招标成本并提高产量。招标费用可能会受到采用不同工作方法的影响。交易成本经济学似乎为研究招标成本提供了一个分析框架,但更多的是与在机构/行业级别而非单个项目级别提供解释有关。在英国进行的抽样调查和访谈。数据表明,尽管在协同工作安排中招标成本不一定会更高,但是招标成本与工作方式之间没有关联。从业人员认为,在协作采购路线中工作的收益远远超过成本。可以改进招标实践以避免浪费,建议的改进措施包括将选择性招标列表限制为23个投标人,让投标人知道他们正在与谁竞争,补偿中止项目的投标费用,并确保及时向投标人提供全面的信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号