首页> 外文OA文献 >Analyzing the Impact of Renewable Energy Incentives and Parameter Uncertainties on Financial Feasibility of a Campus Microgrid
【2h】

Analyzing the Impact of Renewable Energy Incentives and Parameter Uncertainties on Financial Feasibility of a Campus Microgrid

机译:分析可再生能源激励措施和参数不确定性对校园微电网的财务可行性的影响

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The popularity of microgrids is increasing considerably because of their environmental and technical advantages. However, the major challenge in microgrid integration is its financial feasibility due to high capital costs. To address this obstacle, renewable energy incentive programs, which are the motivation of this study, have been proposed in many countries. This paper provides a comprehensive evaluation of the technical and financial feasibility of a campus microgrid based on a techno-economic analysis using the Microgrid Decision Support Tool, which was implemented to support decision-making in the context of microgrid project investment. A method for microgrid design aiming to maximize system profitability is presented. The optimal microgrid configuration is selected depending on financial indices of the project, which directly address the returns on an investment. Most importantly, this analysis captures all the benefits of financial incentives for microgrid projects in California, U.S., which presents a key difference between the California market and other markets. The impact of incentives and uncertain financial parameters on the project investment is verified by sensitivity analysis. The outcomes show that the optimal configuration generates significant electricity savings, and the incentives strongly determine the financial feasibility and the optimal design of a microgrid.
机译:由于其环境和技术优势,微电网的普及正在增加。然而,由于高资本成本,微耕地集成的主要挑战是其财务可行性。为了解决这项障碍,可再生能源激励计划,这是在许多国家提出了这项研究的动机。本文基于使用微电网决策支持工具的技术经济分析,对校园微电网的技术和财务可行性进行了综合评价,该工具是在微电网项目投资的背景下支持决策。提出了一种旨在最大限度地提高系统盈利性的微电网设计的方法。根据项目的财务指标选择最佳的微电网配置,直接解决投资的回报。最重要的是,该分析捕获了加利福尼亚州加利福尼亚州的微电网项目的所有优势,这呈现了加州市场和其他市场之间的关键差异。通过敏感性分析验证了激励措施和不确定的财务参数对项目投资的影响。结果表明,最佳配置产生了显着的电力节省,激励措施强烈确定了微电网的财务可行性和最佳设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号