首页> 美国政府科技报告 >Universal Access System (UAS) Project Plan: FAA Technical Center NAS SecurityResearch Program
【24h】

Universal Access System (UAS) Project Plan: FAA Technical Center NAS SecurityResearch Program

机译:通用接入系统(Uas)项目计划:Faa技术中心Nas安全研究计划

获取原文

摘要

The Universal Access System (UAS) Project Plan details the type and level of theR&D effort necessary to identify, develop, and test a nation-wide UAS. The UAS would be designed to enable air carrier personnel who regularly require access to secured areas to assess such areas with minimal operational delay while enhancing the existing airport security posture. The plan presents three fundamental R&D approaches to this project requiring varying degrees of R&D effort and resources. The standard R&D approach is presented in detail with associated costs and schedule. The three major R&D stages are defined; the UAS concept and alternate analysis stage, the Prototype Conceptual Design and Procurement Stage, and the Prototype and Development Stage. The individual tasks involved in each stage are also discussed.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号