首页> 美国政府科技报告 >Repair of Studded Tire Damage I-5 Pilot Project M.P. 276-278 Northbound Section
【24h】

Repair of Studded Tire Damage I-5 Pilot Project M.P. 276-278 Northbound Section

机译:修复铆钉轮胎损坏I-5试验项目m.p.北行276-278号

获取原文

摘要

In 1996, a pilot project to repair studded tire damage on CRC Pavement wasconstructed on Interstate 5 north of Salem, Oregon. The test section was about 5 km (3 mi.) long a three-lane section of highway. Rut depths on this section were about 20 mm (.80 in.) with most of the damage in the center lane. Since the average daily traffic volume (ADT) was greater than 45,000 the work was done at night. Four different thin AC overlays were placed on the test section. The first was a standard open graded F-mix. The second was the same F-mix with mineral fibers added. The third was a 38 mm (1.5 in.) stone mastic course aggregate mix. Finally, the last section was paved with 25 mm (1.0 in.) lift of a fine stone mastic lift. The work was completed near the end of the paving season and was delayed by a week due to rain. The night paving and the late season low temperatures caused some lay down problems. Lumping of the mix slowed the paving operation and produced a rough ride. Compaction was also low and inconsistent. The section will be monitored for distress for two years. Raveling and/or rutting will be checked periodically.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号