首页> 美国政府科技报告 >GWM: A Ground-Water Management Process for the U.S. Geological Survey Modular Ground-Water Model (MODFLOW-2000) Open file rept
【24h】

GWM: A Ground-Water Management Process for the U.S. Geological Survey Modular Ground-Water Model (MODFLOW-2000) Open file rept

机译:GWm:美国地质调查模块化地下水模型(mODFLOW-2000)的地下水管理流程打开文件数据

获取原文

摘要

GWM is a Ground-Water Management Process for the U.S. Geological Survey modular three-dimensional ground-water model, MODFLOW-2000. GWM uses a response-matrix approach to solve several types of linear, nonlinear, and mixed-binary linear ground-water management formulations. Each management formulation consists of a set of decision variables, an objective function, and a set of constraints. Three types of decision variables are supported by GWM: flow-rate decision variables, which are withdrawal or injection rates at well sites; external decision variables, which are sources or sinks of water that are external to the flow model and do not directly affect the state variables of the simulated ground-water system (heads, streamflows, and so forth); and binary variables, which have values of 0 or 1 and are used to define the status of flow-rate or external decision variables. Flow-rate decision variables can represent wells that extend over one or more model cells and be active during one or more model stress periods; external variables also can be active during one or more stress periods. A single objective function is supported by GWM, which can be specified to either minimize or maximize the weighted sum of the three types of decision variables. Four types of constraints can be specified in a GWM formulation: upper and lower bounds on the flow-rate and external decision variables; linear summations of the three types of decision variables; hydraulic-head based constraints, including drawdowns, head differences, and head gradients; and streamflow and streamflow-depletion constraints. Three sample problems are provided to demonstrate the use of GWM for typical ground-water flow management problems. These sample problems provide examples of how GWM input files are constructed to specify the decision variables, objective function, constraints, and solution process for a GWM run. The GWM Process runs with the MODFLOW-2000 Global and Ground-Water Flow Processes, but in its current form GWM cannot be used with the Observation, Sensitivity, Parameter-Estimation, or Ground-Water Transport Processes. The GWM Process is written with a modular structure so that new objective functions, constraint types, and solution algorithms can be added.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号