首页> 美国政府科技报告 >Stress Measurement of a Jointed Rock Mass during Drift Development
【24h】

Stress Measurement of a Jointed Rock Mass during Drift Development

机译:漂移开发过程中节理岩体的应力测量

获取原文

摘要

An experiment is described in which hollow inclusion cells (HICells) were used to measure stress in a jointed rock mass during drift development at the Stillwater Mine, Nye, MT, USA. Two HICells were installed in the footwall approximately two drift widths ahead of the face. One HICell was overcored and then immediately tested in a biaxial chamber. The other HICell was left in place and monitored as the drift was excavated in three advances, each one-half the width of the drift. Strains were recorded hourly by a datalogger. Results show that there was little stress change during the first and second drift advances, but that a large stress change occurred after the third advance. The measurements also showed that the in situ principal stress directions lined up with regional geologic structures. Stress changes during face advance were likely caused by deformation along localized joint sets and inelastic deformation near the face.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号