首页> 美国政府科技报告 >Pilot Implementation of a New System to Calculate IRI Used for Pavement Design Procedures, Technical Report:Technical rept. (Sept. 2005 - Aug. 2006)
【24h】

Pilot Implementation of a New System to Calculate IRI Used for Pavement Design Procedures, Technical Report:Technical rept. (Sept. 2005 - Aug. 2006)

机译:计算用于路面设计程序的IRI的新系统的试点实施,技术报告:技术报告。 (2005年9月 - 2006年8月)

获取原文

摘要

The pilot implementation of the new system to calculate IRI used for pavement design purposes and applied to the design of pavements on expansive clays subgrades was conducted successfully. Six training sessions were conducted in three Districts: three for design engineers and three for laboratory technicians. Three sets of testing equipment were received, set up, calibrated, and made operational in the three district labs. Two computer programs, one for design and the other for the analysis of a pavement cross-section, to determine the expected performance of expansive clay roughness countermeasures were delivered to the three districts. User guides for each of the programs were provided to each of those in attendance. It is recommended that statewide implementation should now proceed to make this capability available to other districts within the state that have pavement performance problems caused by expansive clay roughness. The statewide implementation effort should include the monitoring validation described above, technical support of the computer programs and laboratory testing, additional training sessions in at least six more districts, and involvement of consulting engineers in the training sessions.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号