首页> 美国政府科技报告 >Evaluation of the Feasibility of Water Supply Withdrawals from the Upper Ocklawaha River Basin - Phase 2: Investigation of Potential Water Supply Yield at Moss Bluff
【24h】

Evaluation of the Feasibility of Water Supply Withdrawals from the Upper Ocklawaha River Basin - Phase 2: Investigation of Potential Water Supply Yield at Moss Bluff

机译:Ocklawaha河流域上游供水取水可行性评估 - 第2阶段:moss Bluff潜在供水产量调查

获取原文

摘要

This technical memorandum (TM) is the second of two prepared for St. Johns River Water Management District (SJRWMD) to address the potential availability of surface water supply within the Upper Ocklawaha River Basin (UORB). The first TM (Phase 1 dated July 24, 2008) provided a screening of available annual streamflow records, within the UORB, and identified the historic record at the Moss Bluff USGS gage for water years 1970 through 2007 as the most applicable for this water supply investigation. The analysis presented herein is based on daily streamflow records for Moss Bluff (USGS Station No. 2238500), for the 38-year period of analysis (POA) from October 1, 1969 through September 30, 2007.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号