首页> 美国政府科技报告 >Monitoring and Load Distribution Study for the Land Bridge
【24h】

Monitoring and Load Distribution Study for the Land Bridge

机译:陆桥监测与荷载分布研究

获取原文

摘要

A monitoring program and a live load distribution study were conducted for the Land Bridge, located on State Highway 131 between Ontario and LaFarge in southwest Wisconsin. The bridge is a 275-feet long curved double trapezoidal steel box girder construction. Hybrid HPS70W and A588 weathering steels were used for the construction of the bridge. The monitoring program included measurements of live load and thermal strains as well as displacements for the girders over a four-year period. The effects of the in-service live load, in terms of both the applied stresses and the number of load cycles, were found to be insignificant. The thermal stress levels were found to be more significant but with only a limited number of load cycles. It was also found that there was no significant change in the load pattern, for both the stress level and number of load cycles, over the four years of the monitoring program for the bridge. The observed stress levels in the bridge were found to be below the fatigue stress threshold prescribed by AASHTO. This indicated that an infinite life could be expected for the bridge when fatigue is a consideration for the steel box girders. The live load distribution study for the Land Bridge included a field testing, a 3-D numerical simulation, and a comparative study of the results with those determined by the provisions of the AASHTO standard and LRFD specifications.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号