首页> 美国政府科技报告 >Helmand Valley Electric Power: Girishk and Kandahar Areas, Afghanistan
【24h】

Helmand Valley Electric Power: Girishk and Kandahar Areas, Afghanistan

机译:赫尔曼德谷电力:阿富汗的吉里什克和坎大哈地区

获取原文

摘要

The contract between AID and the Contractor requires that w the Contractor shall furnish engineering services in connection with (1) the rehabilitation, repair, and improvement of the existing Kandahar and Girishk electric distribution and transmission systems (hereinafter called 'the Systems') and (2) expansion of the Systems to new loads which are expected to be ready for an electric power supply within 30 months after the effective date of this contract. The expansion, rehabilitation, repair, and improvement of the Systems shall be based on the future designs outlined in the Project Planning Report dated April 1962, the Power System Report, Girishk Hydro-Electric System dated March 1963, and the R. W. Beck Report dated November 1964. The future designs shall be limited to facilities actually needed to safely and economically distribute the electric power and energy available from existing electric generating plants and electric generating plants expected to become available during the period of these services. BrS The Contractor shall prepare a 'Design Report' for submission to USAID for approval prior to proceeding with detailed designs and plans for construction, repair, and improvement of the Systems and the purchasing of materials and equipment to be used in the construction, repair, and improvement.

著录项

  • 作者

  • 作者单位
  • 年度 1966
  • 页码 1-32
  • 总页数 32
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号