首页> 美国政府科技报告 >Effect of UT Time-Temperature Model on Duration of Asphaltic Concrete Construction Season
【24h】

Effect of UT Time-Temperature Model on Duration of Asphaltic Concrete Construction Season

机译:UT时间 - 温度模型对沥青混凝土施工期持续时间的影响

获取原文

摘要

Weather conditions in Ohio were studied at four sites for which hourly records were available for significant number of years. Air temperatures and wind velocities were analyzed during the months of March, April, May, October and November, together with other weather data. Application of a previously developed thermodynamic model resulted in a set of 'limiting curves' of wind velocity vs air temperature which define permissible combinations of those variables for construction of bituminous mats of given thickness, for given base surface temperature. The criterion of acceptability was an average mat temperature of at least 175F, ten minutes after placement. Solar flux was found to have little influence during the first ten minutes and this parameter was assigned a constant value representative of Ohio during the months in question. An equation is developed for estimating base surface temperature as a function of air temperature and other variables. Results of this equation are compared with data from the literature.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号