首页> 美国政府科技报告 >Capital Yacht Club Marina Replacement Facility, Subsurface Investigation, Section L001b
【24h】

Capital Yacht Club Marina Replacement Facility, Subsurface Investigation, Section L001b

机译:首都游艇俱乐部码头更换设施,地下调查,L001b部分

获取原文

摘要

Results are summarized of six test borings made in the area of Section L001b of the Washington Metropolitan Area, Metro system where the Capital Yacht Club Marina replacement facility is planned. The exploration is carried out in an area directly outboard of Maine Avenue centered on the location of the existing sunken tubes in Section L001 and extending to a distance of approximately 280 feet outboard of the existing bulkhead in Washington Channel. The report includes two geologic sections through the planned Marina location incorporating the new borings with borings made earlier in Section L001, logs of the six new test borings, results of laboratory tests and soil samples and comments on foundation support conditions.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号