首页> 美国政府科技报告 >HUD Utilities Demonstration Series. Volume 13. Performance Analysis of the Jersey City Total Energy Site: Final Report
【24h】

HUD Utilities Demonstration Series. Volume 13. Performance Analysis of the Jersey City Total Energy Site: Final Report

机译:HUD公用事业演示系列。第13卷。泽西市总能源基地的绩效分析:最终报告

获取原文

摘要

The National Bureau of Standards was responsible for designing and installing the instrumentation and a data acquisition system (DAS) to determine fundamental engineering data from the plant and site buildings. The DAS was put on line in April 1975. The raw data from the DAS was processed by a minicomputer at NBS to obtain a broad spectrum of engineering results. This report describes these systems and presents the appropriate data and a performance analysis of the plant and size. The analysis of the data indicates a significant savings in fuel is possible by minor modifications in plant procedures. This report also includes the results of an analysis of the quality of utility services supplied to the consumers on the site and an analysis of a series of environmental tests made for the effects of the plant on air quality and noise. In general, these analyses reflected favorable results for the total energy plant. Economic and energy analyses are presented for the plant as operated during the period of the study and on a comparative basis with twelve alternative system designs applicable for providing the tenants on the site with equivalent utility services.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号