Roadway Cost Accounting and Project Costing Evaluation Methodology

机译:道路成本核算与项目成本核算评估方法

获取原文

摘要

The study was commissioned to identify a reasonable, equitable method for comparing the costs of roadway construction and maintenance projects. Agencies could thereby make better decisions on whether to contract out construction and maintenance functions, or to perform the activities with their own labor forces. The Project Cost Evaluation Methodology (PCEM) which evolved provides full cost allocation of overhead to projects so that bid limits, day labor, and agency/contractor cost comparisons can be analyzed on a full cost basis. It provides marginal cost decision procedures to compare direct agency costs to contractor price estimates for those occasions when decisions based on a full costing would have agency forces under-utilized. It also enables the agency to better document its decision trees and reporting formats necessary to implement PCEM. Those involved in decision-making on highway or major capital projects should find the document especially interesting.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号