Experimental Determination of the Ultimate Capacity of a Composite Prestressed Bridge Unit

机译:复合预应力桥梁单元极限承载力的试验确定

获取原文

摘要

A 55 ft. long prestressed, composite steel girder-concrete slab bridge unit was tested to ultimate load. The unit had previously undergone a series of tests including sustained loading, fatigue loading, and static loading to first yield. The bridge unit behaved in a ductile manner, deflecting 18.6 inches before failure occurred. Failure was by crushing of the slab at the load application points. The unit supported an applied load 13% greater than the ultimate load predicted. The excess capacity is attributed to strain hardening of the bottom flanges of the girders. Slippage at the slab-girder interface was observed to be small. Existing analysis procedures were found to be adequate for predicting the ultimate capacity of the unit. Load at first yield in a previous test was observed to be lower than predicted. It was determined that the reduction in yield load can be explained by the presence of residual tensile rolling stresses in the bottom flanges of the girders.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号