Elmo Bumpy Torus Proof of Principle. Phase II - Title 1 Report. Volume I. Device Summary

机译:Elmo Bumpy Torus原理证明。第二阶段 - 第1篇报告。第一卷。设备摘要

获取原文

摘要

This document presents a summary of the EBT-P Preliminary Design (Title I) effort. The work was performed, under the direction of ORNL, for the Department of Energy by MDAC-St. Louis. Major subcontractors assisting MDAC included General Dynamics for the magnet system, Gilbert Associates for the device utilities and facility architecture and engineering, and Lockheed - Oak Ridge for engineering support services. The Title I period of performance was from 1 October 1980 to 1 March 1982. (ERA citation 08:006627)