STATION SET REQUIREMENTS DOCUMENT VOLUME 82 FIRE SUPPORT BOOK 2 PRELIMINARY

机译:车站设置要求文件第82卷火力支持手册2初步

获取原文

摘要

This document is one of several volumes which list and describe all of the operational equipment facilities required at Kennedy Space Center to con¬duct Shuttle operations, including early developmental testing.nEach document is limited to a single "station set" - an accumulation of equipment at a particular site or the equipment required to support a specific function. The requirements described in the document are determined by continual review of all available planning paper, contractor proposals, preliminary design drawings, system and CEI specifications concept studies and miscellaneous other sources such as ms?t1ngs and presentations.

著录项

  • 作者

  • 作者单位
  • 年度 1974
  • 页码 1-63
  • 总页数 63
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号